Tiling your shower is a fast and cheap way of changing the appearance of your shower room, and they are mostly preferred because they last longer than other materials. Once the tiles wear out, all attractiveness begins to disappear as assign that the tiles need replacement.

The shower curb usually holds water in position, and it is located on the bathroom floor. Tiling both the shower curb and floor depends on one’s preferences, and it is not necessarily starting with a wall before proceeding to the shower curb. Hence, no rule shows the place which is to be tiled first.

Tile shower curb or floor firsttile shower curb or floor first

People have different perspectives when it comes to which place to install the tiles first. Some people consider applying the mixture of both methods to install tiles on both areas. For instance, you can tile one row of the shower curb towards the other row of the floor. Ensure you focus on the corners to get the best appearance.

However, other people consider tiling the shower curb first while others consider tiling the floor first. If you prefer installing the shower curb first, ensure you consider every factor to avoid damaging the tile and vice versa when installing floor tiles first.

How to install tiles in shower curb and the floorHow to install tiles in shower curb and the floor

Shower cubs are essential because they store water from the shower areas, hence protecting the bathroom floor from any moisture. Most shower curbs are waterproof, and therefore they are resistant to moisture or water released on the shower area. Tiling the shower curb improves the appearance of your shower.

The method used for tiling a shower curb is almost the same as the processes used to tile shower walls and floors. Therefore, ensure you follow the steps below and successfully tile your shower curb.

Step 1: Collect all materials required for tiling the shower curb

The first step when tiling any place is to collect all materials required to tile the places. Most of the materials used are the same but can differ slightly depending on the place you want to tile. The materials required include tiles, grout, a ruler, mortar, tile spacers, sponge, tile cutters, and a protector for measuring angles.

Step 2: Prepare the shower room you want to tile

First, arrange and remove all portable equipment from the shower room. Measure the whole shower room, including the shower curb, to approximate the number of materials required for the tiling of the shower room. Ensure the room is free from any dirt that can interfere with the tiling process.

After cleaning the shower curb, measure it and note down the measurements. Measurements taken include; height, the length of the shower curb and the width. These measurements help you to buy the desired tiles which are required by the whole shower curb.

Step 3: Arranging shower curb tiles

First, bring the tiles and arrange them on the floor. Using a set motor that is thin, apply it to the back of every tile. You can apply the thin motor on the tiles using the recommended materials such as a trowel. This improves the accuracy and efficiency when tiling the shower curb.

Step 4: Remove excess motor applied on the tiles

Remove all excess motor applied at the back of the tiles using a sponge or any other material recommended by a professional. It is advisable to remove all excess thin-set motor applied on the walls to prevent it from sticking on the walls.

Step 5: Spread the recommended batten/batten tape on the floor

Once you have removed the excess thin-set motor, apply the batten/batten tape gently on the floor and ensure you use the correct measurements when using the batten. Avoid spreading too much or less batten on the floor to improve accuracy.

Step 6: Place the tiles slowly on the batten applied

After applying batten tape on the shower curb, place your shower curb tiles and position them as recommended. Ensure you place the tiles in the correct direction with the right side facing upwards and move the tiles gently to spread the thin-set motor applied.

Using a triangular ruler, ensure you check the tiles if they are correctly aligned to each other. Repeat the process for all tiles until you finish arranging all the tiles on the shower curb. Sometimes, you can find that the tiles are too large to fit in the floor measurements. Take the tile cutter and shape the tiles according to the desired shape to fit in the marked measurements perfectly.

Step 7: Apply a thin set motor at the sides of each wall while arranging to ensure they are attached

The thin motor attaches the shower curb tiles to ensure all spaces are filled. Clean the excess thin-set motor from the tiles using the recommended materials. For instance, you can use a sponge and water to remove the excess motor, which can stain the shower curb tiles.

Step 8: Repeat the process on the inner side of the shower curb

Once you are done installing the shower cur tiles outside, proceed to the inner part and repeat the process above until space is filled with tiles. Wipe all excess thin-set motor from the tiles and leave the tiles to dry for approximately 24 hours. Moreover, you can bind the tile edges firmly by using a recommended adhesive.

Step 9: Install tiles on the shower cur floor

Tiling the floor also requires the same procedure as that of the shower curb. Repeat the process until the whole floor is covered with tiles. Ensure you are careful when arranging tiles to get the best appearance. Avoid placing tiles in undesired directions but rather ensure they are in a straight direction. It is advisable always to contact a professional to guide you or tile the shower curb and the floor perfectly and quickly.

you need to know: Tile Shower Floor or Walls First?

Conclusion

Tiling a shower curb and floor is difficult if you fail to follow the recommended steps. Luckily, from the information above, you can successfully install tiles in your shower room and floor.